+1 (713) 513-0246    Houston, Texas

Installation Process

The CC Wizards 5-Step Installation Process

Our premium polyurea/polyaspartic coating system is applied through a meticulous process that ensures exceptional results for your concrete surfaces. Most standard 2-3 car garage projects (300-650 sq ft) are completed in just one day with our efficient team of experts.

1

Assessment & Preparation

Diamond grinding and thorough cleaning creates the perfect foundation.

2

Repairs & Crack Filling

All damage is meticulously repaired with our specialized fillers.

3

Base Coat Application

Our polyurea primer and base coat creates a strong adhesion foundation to the concrete.

4

Decorative Layer

Color flakes or metallic pigments create your custom aesthetic.

5

Top Coat & Completion

A protective clear coat seals your surface for decades of performance.

Your Same-Day Installation Timeline!

Based on a standard 2-car garage project (400-500 sq ft), here’s what happens during your transformation:

2-3 hrs

Surface Preparation

We create the perfect foundation with our thorough prep process:

  • Diamond grinding with 99% dust control
  • Crack and damage repair
  • Complete surface cleaning
1-2 hrs

Base Coat Application

Your floor transformation begins with our premium polyurea primer:

  • Small-batch mixing for quality control
  • Precision application techniques
  • 1-2 hour curing period
1 hrs

Decorative Layer

Your custom look comes to life with color and texture:

  • Hand-broadcast flake application
  • Metallic pigment manipulation (if selected)
  • Consistent coverage throughout
  • Broadcast directly into still curing base coat
1 hrs

Prep For Top Coat

One last quality check before the clear coat.

  • Remove excess flake
  • Scrape floor to ensure texture is a nice smooth orange peel finish
  • Examine floor for any inconsistencies and fix as needed
1-2 hrs

Top Coat & Sealing

The final protective layer that ensures lasting beauty:

  • UV-stable clear coat application
  • Consistent and seamless seal over entire surface
  • Anti-slip additives (if specified)
Curing

After We Leave: Curing Timeline

  • 12 hours: Normal foot traffic safe
  • 12-24 hours: Furniture placement (with felt pads)
  • 24 hours: Vehicle parking

Note: Your specific project timeline may vary based on size and complexity. Your project consultant will provide a custom timeline during your pre-installation meeting.

The Polyaspartic Advantage

Our advanced coating system offers significant benefits over traditional concrete coatings:

Rapid Installation

One-day completion with minimal disruption to your schedule.

Superior Durability

4x stronger than epoxy with exceptional resistance to impacts and chemicals.

Temperature Tolerance

Withstands -30°F to 140°F without cracking or peeling.

Common Installation Questions

Other Frequently Asked Questions

What Our Customers Say

Don’t just take our word for it. Hear from Houston homeowners and businesses who’ve experienced the 5-star CC Wizards difference firsthand.

This is a staging environment